Find and select multiple lines to change order
-
@Victor-Fansler said in Find and select multiple lines to change order:
. I may not have made it clear, but the line’s “Camera Name” can be anything, they do not actually say “Camera Name”.
I have an idea, but as not on the PC I will present the concept.
- Combine the set together on 1 line by using the empty line between sets to identify them using a special character (or 2) when combining to be used in subsequent steps.
- The second regex would be run repeatedly until no changes made by copying the line to below the original, but with only the last camera name, also removing that from the original line at the same time. So not an exact copy.
- Tidy up the lines by formatting as required, although this may get possible in step 2.
Terry
-
Hi, @victor-fansler, @terry-r and All,
Ah…OK ! But I think, Victor, that the best way would be to show us a list of, let’s say,
4to10initial blocks, as well as the expected layout of these blocks, AFTER modifications !
Anyway, I give it a new try ! So, starting with this text :
Connection Lost to Camera Line 3 of Set 1 Line 2 of Set 1 Line 1 of Set 1 Account: Christopher Video Return Line 1 of Set 2 Account: Margaret Fatal Error Line 1 of Set 3 Line 6 of Set 3 Line 2 of Set 3 Line 5 of Set 3 Camera Name 0 Line 7 of Set 3 Line 3 of Set 3 Account: EltonWith the regex S/R below :
-
SEARCH
(?-s)^(.+\R)((?:.+\R)+) -
REPLACE
\2\1
We first get, as before, the following OUTPUT :
Line 3 of Set 1 Line 2 of Set 1 Line 1 of Set 1 Account: Christopher Connection Lost to Camera Line 1 of Set 2 Account: Margaret Video Return Line 1 of Set 3 Line 6 of Set 3 Line 2 of Set 3 Line 5 of Set 3 Camera Name 0 Line 7 of Set 3 Line 3 of Set 3 Account: Elton Fatal ErrorThen, with this second S/R, slightly modified :
-
SEARCH
(?-s)^.+(?=\R(?:.+\R)*Account: (.+)\R(.+)\R)|^(.+\R){2}(?=^\R) -
REPLACE
?1\1 - $0 - \2
You should get your expected text :
Christopher - Line 3 of Set 1 - Connection Lost to Camera Christopher - Line 2 of Set 1 - Connection Lost to Camera Christopher - Line 1 of Set 1 - Connection Lost to Camera Margaret - Line 1 of Set 2 - Video Return Elton - Line 1 of Set 3 - Fatal Error Elton - Line 6 of Set 3 - Fatal Error Elton - Line 2 of Set 3 - Fatal Error Elton - Line 5 of Set 3 - Fatal Error Elton - Camera Name 0 - Fatal Error Elton - Line 7 of Set 3 - Fatal Error Elton - Line 3 of Set 3 - Fatal ErrorAnd, after a classical alphabetical sort, we obtain :
Christopher - Line 1 of Set 1 - Connection Lost to Camera Christopher - Line 2 of Set 1 - Connection Lost to Camera Christopher - Line 3 of Set 1 - Connection Lost to Camera Elton - Camera Name 0 - Fatal Error Elton - Line 1 of Set 3 - Fatal Error Elton - Line 2 of Set 3 - Fatal Error Elton - Line 3 of Set 3 - Fatal Error Elton - Line 5 of Set 3 - Fatal Error Elton - Line 6 of Set 3 - Fatal Error Elton - Line 7 of Set 3 - Fatal Error Margaret - Line 1 of Set 2 - Video Return
I hope that this new layout meets your needs :-))
BR
guy038
-
-
@guy038 said in Find and select multiple lines to change order:
?1\1 - $0 - \2
Thanks, that works. Needs a little cleanup afterwards, but I can deal with that. For some reason it did not remove the last two lines (Account and Connection lost), in the document.
I wanted to send an actual example of the file, but can’t really share the real information.
Have a Great Weekend!!
-
Hello, @victor-fansler, @terry-r and All,
Aaarrrgggh ! Always this damn problem of texts that do not end with a last line break !
So, before running the regexes, just be sure that your current file ends with a final line-break (
View > Show Symbol > Show All Characters)I also, realized that my second regex did not take in account such a possibility !
Indeed, in the last alternative of my second regex, the part
^(.+\R){2}(?=^\R)searches for2complete lines, with their line-breaks (CRLF) but ONLY IF it is followed with a pure blank lineSo, either :
- Use my previous second search regex
(?-s)^.+(?=\R(?:.+\R)*Account: (.+)\R(.+)\R)|^(.+\R){2}(?=^\R)and your current file must end this way :
SECOND to last lineCRLF LAST NON-empty lineCRLF CRLF- Or use this new search version
(?-s)^.+(?=\R(?:.+\R)*Account: (.+)\R(.+)\R)|^(.+\R){2}(?=^\R|\z)and your current file could simply end as below :
SECOND to last lineCRLF LAST NON-empty ineCRLFBR
guy038
- Use my previous second search regex
-
@guy038 said in Find and select multiple lines to change order:
Always this damn problem of texts that do not end with a last line break !
I gave up dealing with that problem long ago when I started to use the editorconfig plugin. With it you can specify that files should always end with an line-ending sequence.
Too bad that isn’t a native feature of Notepad++.
-
Hello @victor-fansler, @terry-r, @alan-kilborn and All,
You said, in your chat message :
The “Camera” is a placeholder and can be any text, but will end with a Date and Time
So I suppose that all these lines always end with the three uppercase letters
PSTIf this assumption is right, here are new versions of the regexes ( The first and second one ). Note also that I improved these regexes :
Now, you don’t even need to separate any section with blank line(s) ;-))
So starting with your INPUT text, where I added some empty lines :
Video Return Camera-1 02/14/2022 08:31AM PST Account: Customer Name - Server Name Video Return Camera-1 02/14/2022 02:27AM PST Account: Customer Name - Server Name Connection Lost to Camera Camera-1 02/14/2022 12:25AM PST Account: Customer Name - Server Name Video Return Camera-1 02/14/2022 12:23AM PST Account: Customer Name - Server Name Video Return Camera-1 02/13/2022 09:31AM PST Camera-4 02/13/2022 09:31AM PST Camera-2 02/13/2022 09:31AM PST Camera-3 02/13/2022 09:31AM PST Account: Customer Name - Server Name Video Return Camera-1 02/13/2022 04:57AM PST Camera-4 02/13/2022 04:57AM PST Camera-3 02/13/2022 04:57AM PST Account: Customer Name - Server Name Connection Lost to Camera Camera-2 02/13/2022 01:43AM PST Account: Customer Name - Server Name Video Return Camera-1 02/13/2022 01:42AM PST Camera-4 02/13/2022 01:42AM PST Camera-2 02/13/2022 01:42AM PST Camera-3 02/13/2022 01:42AM PST Account: Customer Name - Server Name Connection Lost to Camera Camera-1 02/12/2022 07:18PM PST Camera-4 02/12/2022 07:18PM PST Camera-2 02/12/2022 07:18PM PST Camera-3 02/12/2022 07:18PM PST Account: Customer Name - Server Name
First, use the following regex S/R in order to place the line
Video ReturnORConnection Lost to Camera, after each lineAccount :SEARCH
(?-s)^(.+\R)((?:.+\R)+?Account: .+\R)\R*REPLACE
\2\1We get this text :
Camera-1 02/14/2022 08:31AM PST Account: Customer Name - Server Name Video Return Camera-1 02/14/2022 02:27AM PST Account: Customer Name - Server Name Video Return Camera-1 02/14/2022 12:25AM PST Account: Customer Name - Server Name Connection Lost to Camera Camera-1 02/14/2022 12:23AM PST Account: Customer Name - Server Name Video Return Camera-1 02/13/2022 09:31AM PST Camera-4 02/13/2022 09:31AM PST Camera-2 02/13/2022 09:31AM PST Camera-3 02/13/2022 09:31AM PST Account: Customer Name - Server Name Video Return Camera-1 02/13/2022 04:57AM PST Camera-4 02/13/2022 04:57AM PST Camera-3 02/13/2022 04:57AM PST Account: Customer Name - Server Name Video Return Camera-2 02/13/2022 01:43AM PST Account: Customer Name - Server Name Connection Lost to Camera Camera-1 02/13/2022 01:42AM PST Camera-4 02/13/2022 01:42AM PST Camera-2 02/13/2022 01:42AM PST Camera-3 02/13/2022 01:42AM PST Account: Customer Name - Server Name Video Return Camera-1 02/12/2022 07:18PM PST Camera-4 02/12/2022 07:18PM PST Camera-2 02/12/2022 07:18PM PST Camera-3 02/12/2022 07:18PM PST Account: Customer Name - Server Name Connection Lost to Camera
Now, using this second regex S/R :
SEARCH
(?-is)^.+PST(?=\R(?:.+PST\R)*?(Account: .+)\R(.+)\R)|^(.+\R){2}REPLACE
?1\1 - $0 - \2We get the OUTPUT text :
Account: Customer Name - Server Name - Camera-1 02/14/2022 08:31AM PST - Video Return Account: Customer Name - Server Name - Camera-1 02/14/2022 02:27AM PST - Video Return Account: Customer Name - Server Name - Camera-1 02/14/2022 12:25AM PST - Connection Lost to Camera Account: Customer Name - Server Name - Camera-1 02/14/2022 12:23AM PST - Video Return Account: Customer Name - Server Name - Camera-1 02/13/2022 09:31AM PST - Video Return Account: Customer Name - Server Name - Camera-4 02/13/2022 09:31AM PST - Video Return Account: Customer Name - Server Name - Camera-2 02/13/2022 09:31AM PST - Video Return Account: Customer Name - Server Name - Camera-3 02/13/2022 09:31AM PST - Video Return Account: Customer Name - Server Name - Camera-1 02/13/2022 04:57AM PST - Video Return Account: Customer Name - Server Name - Camera-4 02/13/2022 04:57AM PST - Video Return Account: Customer Name - Server Name - Camera-3 02/13/2022 04:57AM PST - Video Return Account: Customer Name - Server Name - Camera-2 02/13/2022 01:43AM PST - Connection Lost to Camera Account: Customer Name - Server Name - Camera-1 02/13/2022 01:42AM PST - Video Return Account: Customer Name - Server Name - Camera-4 02/13/2022 01:42AM PST - Video Return Account: Customer Name - Server Name - Camera-2 02/13/2022 01:42AM PST - Video Return Account: Customer Name - Server Name - Camera-3 02/13/2022 01:42AM PST - Video Return Account: Customer Name - Server Name - Camera-1 02/12/2022 07:18PM PST - Connection Lost to Camera Account: Customer Name - Server Name - Camera-4 02/12/2022 07:18PM PST - Connection Lost to Camera Account: Customer Name - Server Name - Camera-2 02/12/2022 07:18PM PST - Connection Lost to Camera Account: Customer Name - Server Name - Camera-3 02/12/2022 07:18PM PST - Connection Lost to Camera
I hope that it is your expected text !?
See you later !
Best Regards,
guy038
-
Is there a special reason for the recent revisit to something asked 5 months ago? Just asking…in case I am missing some sort of newly discovered technique…
-
Hi, @alan-kilborn,
Well, it’s just that we cannot place more than
1,000characters in a chat message. So I preferred to answer in our forum !But, indeed, I was asked to create a new post or to continue with that one !
I have just re-indicated to @victor-fansler, the title of this article
BR
guy038
-
@guy038 said in Find and select multiple lines to change order:
But, indeed, I was asked to create a new post or to continue with that one !
Ah, OK, makes sense! I wasn’t sure your previous use of “chat” really meant that or just conversation above in this thread.
Chat is useful if something really gets specific to an OP’s need and really can’t benefit anyone else. Otherwise it is good to see the conversation in a real post.
-
@alan-kilborn said in Find and select multiple lines to change order:
I gave up dealing with that problem long ago when I started to use the editorconfig plugin. With it you can specify that files should always end with an line-ending sequence.
I would have thought you’d have a PythonScript for that! :-)
Cheers.
-
@michael-vincent said in Find and select multiple lines to change order:
I would have thought you’d have a PythonScript for that
It would be an easy script, but I don’t tend to re-invent the wheel unless I’m going to make the wheel better. And editorconfig works just fine in this regard, so…just keep rollin’.
-
@michael-vincent said in Find and select multiple lines to change order:
…PythonScript for that…
Well… I looked into my folder of “retired” scripts and I found that I used to use the SCOTT SCRIPT for doing it before I discovered the editorconfig plugin.
-
@guy038 Thanks for this and sorry for any confusion. Unfortunately, the lines will not always end with PST. There are different time zones. Primarily PST and MST, but could be MDT as well.
-
You really have to stop moving the goal posts. :) Poor @guy038 must have a real life, even if he does love doing this stuff, I suspect he’d like to fix it once and move on. :)
Lee
-
Hi, @darthdata and All,
In this case, change the second regex S/R into this one :
SEARCH
(?-is)^.+(?:PST|MST|MDT)(?=\R(?:.+(?:PST|MST|MDT)\R)*?(Account: .+)\R(.+))|^(.+\R){2}REPLACE
?1\1 - $0 - \2BR
guy038